Fall 2010
Web version | www.JadeLearning.com
Welcome!

It has been a busy summer with classes in North Carolina, a renewal deadline in Florida, and fresh paint in our office interior. It will also be a busy fall since we are currently working on our 2011 NEC Changes courses. We're planning to have the new courses available online in January.

Please send us an email at: newsletter@jadelearning.com if you would like to share an experience, idea, or installation tip with other electrical professionals.

David Burtt, JADE Learning

 


Red Tag / Green Tag

Red Tag

Installer
I have an outdoor HVAC unit and a receptacle outlet in the crawlspace within 25 ft. of the outdoor HVAC unit. I did not install an outlet for the HVAC unit because I thought the receptacle in the crawl space could serve as the required outlet for the HVAC unit. The installation was red tagged.

Why?


Photovoltaics: Part 1 - System Design and Layout

First in a three part series about photovoltaics, this article will focus on the basic design and layout of a photovoltaic (PV) array. Following are some important questions to consider when installing a system: 1.) How much energy needs to be generated?, 2.) Where will the system be located?, 3.) What kind of system will be installed?, and 4.) Total cost?.

Click on the image below to continue the article.

PV Article


Question of the Season

In a solar photovoltaic system that is tied into the utility grid, the output from the Inverter is backfed into a circuit breaker in a panelboard that is supplied from the utility.  If the circuit breaker that is backfed from the inverter is a plug-in type, is an additional fastener required to secure the circuit breaker in the panelboard?

a.) Yes, it's required in states that have adopted the 2005 NEC or 2008 NEC.

b.) No.

c.) Yes, but it's only required in states that have adopted the 2008 NEC.

Know the answer? Email us at: newsletter@jadelearning.com. The first two people to respond with the correct answer and their name and mailing address will receive a prize from JADE Learning.

© 2010 . 1-800-443-5233 . www.JadeLearning.com


Washington Licensees

L&I is currently accepting proposals for the new WAC. This period ends October 8th, so if you have suggestions, hurry online to L&I's web site.

Also, starting October 1st, 2010, L&I is increasing the electrical permit and licensing fees. For more information, go to new regulations.

Click here to check your continuing education hours.

Already completed your continuing education and ready to renew? Click here to renew your license online.

 


More I Fixed It!

There I Fixed It

View More...

You Tube Video

Worst Electrical Work Ever; Click here to see more electrical work that is red-tag worthy!

 


2010 Sticker Campaign

George Tiffany

August WInner George Tiffany, sky diving over central Florida

If you haven't entered our sticker contest yet, there's still time. We'll be awarding additional prizes over the next few months. It's so easy, all you have to do is 1.) Get a JADE Learning sticker by clicking here or calling 1-800-443-5233. 2.) Put your sticker somewhere interesting. 3.) Take a picture. 4.) Email it to: instructor@jadelearning.com, Text it to: 919-332-9317, or Mail it to: JADE Learning, PO Box 17228, Raleigh, NC 27619.