Winter 2010
Web version | www.JadeLearning.com

Grounding A Service

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

See how the conductors are sized and installed according to Article 250 of the 2008 NEC. The demonstration shows the correct size and placement of the grounded neutral conductor, the grounding electrode system, the bonding jumper on the supply side of the service, and the main bonding jumpers in each enclosure.

 

Back to Newsletter